EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
S-21
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (272)
Research
- (1)
Workshop
- (1)
Empennage
- (36)
Fuselage
- (48)
Firewall
- (14)
Tail Feathers
- (1)
Wings
- (93)
Controls
- (10)
-
Rudder cable system
-
Rudder cable system
-
Mounted control...
-
Aileron cable...
-
Flap handle install
-
Aileron control...
-
Rear return cable...
-
Rear rudder return...
-
Throttle &...
-
Balance ailerons and...
Avionics
- (10)
Lighting
Instrument Panel
- (4)
Landing Gear
- (5)
Engine
- (30)
Propeller
Fuel System
- (1)
Interior Finish
- (12)
Paint / Decals
- (4)
Inspection
Tools
- (2)
Builder Name:
Kent Ingram
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
538.2
Total Flight Time:
Start/Last Date:
May 09, 2020 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=S-21
Home or Last Project Picture
Dec 10, 2022
Flap handle install
- (1.5 hours)
Category: Controls
Gather parts and assemble flap handle assembly. Went ahead and mounted in fuselage to keep track of things. It will need to be partially unassembled to install the teleflex cables to the flaps once the wings are on.
A64B89DB-FDA1-4841-9C8F-98433A1F0A91.jpeg
D3FAFB01-BB94-4794-8E7A-EC4112609902.jpeg
76082B41-0CF6-43AB-8942-6427D9153626.jpeg
8E88590E-7363-4152-8DC8-7B13E669D432.jpeg
3E2FFA08-2777-4BB6-9C88-C74A16F54E07.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.